Friday, September 26, 2025
  • Home
  • Disclaimer
Great Achiever Magazine
Advertisement
  • News
  • Education
  • Politics
  • Business
  • Metro
  • Entertainment
  • Opinion
No Result
View All Result
Great Achiever Magazine
  • News
  • Education
  • Politics
  • Business
  • Metro
  • Entertainment
  • Opinion
No Result
View All Result
Great Achiever Magazine
No Result
View All Result
Parallex Bank Mobile App 2.0 Parallex Bank Mobile App 2.0 Parallex Bank Mobile App 2.0
ADVERTISEMENT
Home News

Ogun set to generate electricity from 9 Megawatts hydro power plant at Ogun-Osun River Basin Devt. Authority 

admin by admin
March 22, 2025
in News
0
Ogun set to generate electricity from 9 Megawatts hydro power plant at Ogun-Osun River Basin Devt. Authority 
795
SHARES
3.3k
VIEWS
Share on FacebookShare on Twitter
ADVERTISEMENT

Ogun State Governor, Prince Dapo Abiodun, has disclosed that the state government is considering generating electricity from the 9 Megawatts hydro power plant, located within the Ogun-Osun River Basin Development Authority.

The governor, who stated this during an on-the-spot assessment of facilities at the Ogun-Osun River Basin Development Authority on Friday, said that his administration is already in alliance with the Bureau of Public Enterprises (BPE) on the modalities for the takeover.

You might also like

Value Jet set to begin lifting passengers at Gateway Airport

OGSG vows not to compromise on standards in Senator Daniel’s 260-metre road 

Senator Natasha returns to office after six months suspension

He said that taking over the hydro power plant will boost his administration’s plan to improve power supply across the state, as it would be merged with the 30 Megawatts power plant in Onijanganjangan, which, being gas-fired, would ensure that the state has the right energy mix.

Governor Abiodun stated that the abandoned dam and hydro power plant, commissioned in 1983, represents stranded renewable energy that his administration intends to take advantage of.

He described the idea behind the establishment of the dam as noble, as it was meant to manage water outflow from neighbouring countries, local water tributaries, irrigation, power generation, and farming, among others.

“From the information we have, one of the three turbines was commissioned, but the other two were not commissioned because they were not fully installed.

“We have been engaging with the Bureau of Public Enterprises, and there is an alliance between our government and the Bureau to take over this hydro power plant and merge it with our gas-fired plant so that we have the right energy mix.

“And that is another reason why we are here – to see what we can do to ensure that the stranded or idle power plants are fully optimized.

“I am sure that in the next few weeks, engineers will be here to ascertain the integrity and how we can resuscitate this plant for the use and benefit of our sons and daughters of Ogun State under our Ogun State Light Up Project. I mentioned earlier that we are going to have power plants in Abeokuta, Ijebu, Remo, and Yewa to ensure that we have enough power supply,” he said.

ADVERTISEMENT

The Governor also spoke on the need to turn the land around the River Basin into farm clusters to take advantage of the presence of water and irrigation for all-year farming seasons, in line with the Renewed Hope Food Initiative of President Bola Ahmed Tinubu.

According to him, the vast land around the River Basin axis is also suitable for cattle farming, as cattles require water.

ADVERTISEMENT

“We’ve seen that we can further utilize the potential that the dam offers. We will ensure that we look at the ownership of farmlands around here, ensure that there is proper acquisition of those farms, and ensure that those farms are properly farmed, particularly under the Renewed Hope Food Initiative, to ensure we grow what we eat and eat what we grow,” he added.

Governor Abiodun applauded the forebears of the country for conceiving the project, stating, “This project is laudable, but just like many federal government ideas and projects, most times, you find them not sustained and not fully optimized, and this is no exception.”

Governor Abiodun also noted that the Managing Director of the River Basin has debunked the rumors that it is the water from the dam that causes the perennial flooding in Isheri, adding that his administration would look into the claims of the Managing Director that the flooding is a result of water from other sources.

ADVERTISEMENT
Previous Post

Rivers Sole Administrator confirms release of withheld allocations

Next Post

Federal High Court grants recall process of Senator Natasha

admin

admin

Related Posts

Value Jet set to begin lifting passengers at Gateway Airport
News

Value Jet set to begin lifting passengers at Gateway Airport

by admin
September 26, 2025
Alleged stoppage of ongoing federal road project at Sagamu: OGSG sets record straight 
News

OGSG vows not to compromise on standards in Senator Daniel’s 260-metre road 

by admin
September 25, 2025
Senator Natasha returns to office after six months suspension
News

Senator Natasha returns to office after six months suspension

by admin
September 24, 2025
Alleged stoppage of ongoing federal road project at Sagamu: OGSG sets record straight 
News

Road Projects: OGSG tells Senator Daniel to follow due process 

by admin
September 23, 2025
Creative industry now global economic powerhouse – Abiodun
News

Creative industry now global economic powerhouse – Abiodun

by admin
September 22, 2025
Next Post
Senate considers six-month suspension for Natasha

Federal High Court grants recall process of Senator Natasha

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

ADVERTISEMENT
Great Achiever Magazine

Great Achiever Magazine showcases people of accomplishments, notable events and general news with a touch of professionalism.

It is a highly informative, educative and entertaining publication.

Great Achiever Magazine comes in hard copy and online editions.

Established in 1996.

Contact Us:

Website – www.greatachievermagazine.com.ng

Email – greatachievermagazine@gmail.com

Telephone – 08033760753

Yomi Ogunsanu
Publisher/Editor-in-Chief

Categories

  • Agriculture
  • Business
  • Crime
  • Economy
  • Education
  • Entertainment
  • Events
  • Fashion
  • Food
  • Health
  • International
  • Interview
  • Lifestyle
  • Metro
  • News
  • Opinion
  • Politics
  • Sports
  • Technology
  • Travel
  • World
Police recover stolen child sold for ₦3.7m

Police recover stolen child sold for ₦3.7m

September 26, 2025
Value Jet set to begin lifting passengers at Gateway Airport

Value Jet set to begin lifting passengers at Gateway Airport

September 26, 2025
Alleged stoppage of ongoing federal road project at Sagamu: OGSG sets record straight 

OGSG vows not to compromise on standards in Senator Daniel’s 260-metre road 

September 25, 2025

© 2025 - Great Achiever Magazine. All rights reserved.

No Result
View All Result
  • Home
  • News
  • Metro
  • Entertainment
  • Politics
  • Sports
  • Education
  • About Us

© 2025 - Great Achiever Magazine. All rights reserved.